English Version Italian Deutsch Version Wersja Polska

  • Home site
  • Collection
  • Technology
  • Movies
  • For architects
  • Blog
  • About us
  • For distributors
  • contact
    • Home site
    • Collection
    • Technology
    • Movies
    • For architects
    • Blog
    • English Version
    • Italian
    • Deutsch Version
    • Wersja Polska
    • contact
    • About us
    • For distributors
    Artech FullGlass logo
    WORLD PREMIERE OF THE PRODUCT

    INSTALLATION OF WINDOW JOINERY IN FULLGLASS TECHNOLOGY

    INSTALLATION OF WINDOW JOINERY IN FULLGLASS TECHNOLOGY


    Our customers often ask about the installation of our latest product - FullGlass windows, doors and patio doors. This most innovative product technology is based on PVC - tight, with very good thermal parameters, practically maintenance-free, so we decided to choose this raw material as a basis, says Marcin Mikołajczyk, Artech's Chief Engineer.

    Guidelines of the Building Research  Institute (ITB) shall be applied to the installation of window joinery. Proper installation and maintenance will ensure failure-free use of PVC window joinery for many years to come.

    The installation of Artech FullGlass windows and doors is based on the same rules as the installation of PVC windows and doors.

    Before taking a decision who will perform the installation in our house, it is worth checking the opinions on the installation company, because my experience confirms that in 99% of cases, the complaints about window joinery in our company result from incorrectly performed installation.

    Our guarantee liability is limited to installations carried out in accordance with the "Installation and Maintenance Instructions" provided to our Customers.

    Please read more on 5 most often installation errors and their consequences:

    Window installation without proper cleaning of the substrate causes the formation of cracks through which moisture and air can penetrate, dampness of the wall, leakage of water from underneath the window sill, draughts, moisture conducive to the development of mould fungi.  

    Too few anchors or dowels used for the installation cause deformation of the window, leakage, penetration of moisture into the interior, draughts. 

    Too few anchors or dowels used for the installation cause deformation of the window, leakage, penetration of moisture into the interior, draughts. 

    Uneven window seating, incomplete sealing causes window deformation, penetration of rainwater into the interior, draughts, wall dampness.

    Excessive expansion joint clearance on the window frame side causes water vapour to condensate on the panes, air to enter the room, and after some time, water to leak into the room. 

     

    « Previous post Next post »



    Artech FullGlass
    MILANO

    artech@artech-fullglass.com
    Contact

    © Copyright 2026 by Artech FullGlass